Colombo Street Panels erected and first floor ready to be poured!
colombo street
COLOMBO STREET EARTHQUAKE REPAIRS UNDERWAY /
Lewis & Barrow provided structural design of repairs and carried out the site supervision of the lifting work on this Colombo Street building. Careful monitoring of the building during the lift ensured the building was brought back into level. Large steel beams provided the support and were then fixed in place.
COLOMBO STREET - COMING BACK! /
Lewis & Barrow Ltd have provided the Structural design for the new banking and retail building at 664/668 Colombo Street. Structural supervision is currently being undertaken through the construction process.